Goyder South Wind Farm

Client: Elecnor Australia

Project Value: $25 million

Start Date: October 2023

Completion Date: May 2024

 
 

Project Summary

A One Earthworks is responsible for delivering the Balance of Plant Contract for the Goyder South Wind Farm. Goyder South Stage 1 is the first stage of Neoen’s Goyder Renewables Zone. GE Renewable Energy Australia and Elecnor Group’s Green Light Contractors (GLC) form the EPC consortium.

The Goyder South Stage 1 Wind Farm is located in South Australia’s Mid North region, approximately 100km north-east of Adelaide and 5.5km south of the township of Burra.

Scope of works

A One Earthworks was responsible for the delivery of:

• 15 km of Internal access roads designed to cater for the oversize/over mass component delivery vehicles

• 440,000 m3 cut to fill earthworks including 235,000 m3 of drill and blast.

• 13 Turbine foundations, crane hardstands and blade laydown pads. Each approximately 20 m in diameter. Turbin excavation and base cleaning for blinding.

• All storm water infrastructure.

• All program quality management including geotech services and survey.

• All safety management under client systems.

• To meet project demands A One Earthworks employed a number of local suppliers, labour and operators to assist in resourcing the works.

Project Team

To deliver the Goyder South Wind Farm project, A One Earthworks mobilised our experienced Canberra-based team to Burra, SA. The team comprises a dedicated Project Manager, skilled engineers, supervisors, and leading hands who are on-site for the project duration.

Key Personnel

Superintendent: Phil Caldwell

Project Director: Matt Willis

Project Engineer: Prateek Jetti

Site Engineers: Adam Goddard, Dani Caruso, Naman Punia

Supervisor: Shane Hudson

 

Project Highlights

67,000M3 LARGEST SINGLE BLAST

4350 M3/DAY AVERAGE PRODUCTIVITY

13 ENDANGERED PBTL LIZARDS RELOCATED

83 PERSONS PEAK WORKFORCE

 